Customization: | Available |
---|---|
After-sales Service: | 1 Years |
Warranty: | 1 Years |
Still deciding? Get samples of $ !
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Instructions for Laying Internal Cables, Oil Pipes, Water Pipes, or Gas Pipes
Reserve a 15% margin to allow free movement of internally laid cables and oil pipes, ensuring no stress on the drag chains along the radius.
For cables with varying diameters, lay them separately to balance the weight. Use spacers if necessary to keep them organized.
During high-speed or high-frequency operations, horizontally laid cables should not overlap. If there are too many cables, gas pipes, and oil pipes, use spacers for separation.