Customization: | Available |
---|---|
After-sales Service: | 1year |
Warranty: | 1year |
Still deciding? Get samples of $ !
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Instruction principles for internally laid cable, oil pipe, water pipe, or gas pipe
Reserve 15% of the space as a margin to allow internally laid cables and oil pipes the freedom to move. This prevents any stress on the drag chains in the radial direction.
Cables with significantly different diameters should be laid separately to balance the weight evenly. If needed, use spacers to keep them divided and organized.
For high-speed or high-frequency operations, horizontally laid cables should not overlap. Use spacers if there are many cables, gas pipes, and oil pipes laid together.
Construction of the cable chain
The chain appearance resembles a tank crawler, consisting of multiple joints that can rotate freely.
Chains in the same series have identical inner and outer heights and the same pitch. However, the inner width and bend radius (R) can be customized as per different specifications.
Each unit chain joint comprises a left-right chain plate and an up-down cover. These joints can be easily opened to facilitate assembly and dismantling without threading. Cables, oil pipes, and gas pipes can be placed into the drag chain once the cover is opened.
Spacers are available to divide the internal space of the chain into sections according to specific requirements.
How to choose RUIAO size? Please get in touch with our expert sales team for personalized assistance and comprehensive support~
Q: Are you a trading company or a manufacturer?
A: We are a factory.
Q: How long is your delivery time?
A: Generally, it takes 5-10 days if the goods are in stock. If the goods are not in stock, it will take 15-20 days, depending on the
quantity.
Q: Do you provide samples? Are they free or extra?
A: Yes, we can offer samples free of charge, but the freight cost is not included.
Q: What are your terms of payment?
A: For payments <=1000 USD, 100% payment in advance. For payments >=1000 USD, 30% T/T in advance and the balance before shipment. If you have any other questions, please feel free to contact us at any time.
Q: Will you provide an installation video?
A: Yes, we will share aninstruction manual or sample video to assist you.
Q: Can I visit your factory via a live tour?
A: Yes, we can arrange a LIVE SHOW via WhatsApp, WeChat, or Trademanager.
Q: What is your nearest port?
A: The nearest port is Tianjin Seaport and Beijing Airport. We can also arrange shipment to any port in China.