Customization: | Available |
---|---|
After-sales Service: | 1 Years |
Warranty: | 1 Years |
Still deciding? Get samples of $ !
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Instructions for Internally Laid Cables, Oil Pipes, Water Pipes, or Gas Pipes
Reserve 15% of the space as a margin. This allows internally laid cables and oil pipes to move freely, ensuring they exert no stress on the drag chains in the radial direction.
For cables with significantly different diameters, lay them separately to balance the weight evenly. If needed, use spacers to keep them apart.
During high-speed or high-frequency operations, horizontally laid cables should be spaced apart and not overlapped. If there are too many cables, gas pipes, and oil pipes laid together, it is recommended to use spacers to separate them.